Enterprise Transparency

Live Project Tracking Portal

Experience absolute milestone accountability. Track your home's structural tests, daily engineering sign-offs, and upcoming handover dates in real time.

MG-LKO-2026-01 In Progress Turnkey Residential Construction

Bespoke G+1 Duplex Villa

Dubagga Bypass, Lucknow  |  Client: Er. Rajesh & Sunita Verma

68%
Overall Completion
Current Stage: First Floor Slab Casting & Concealed Conduiting 68% Completed
Package Gold Package (₹2,200/sq.ft.)
Built-up Area 2,450 sq.ft.
Project Kickoff 15 Jan 2026
Handover Target 20 Oct 2026

Stage-wise Construction Milestones

Each milestone requires structural inspection and photographic sign-off before subsequent phases commence.

Architectural Blueprint & Soil Bearing Test

20 Jan 2026

Soil test passed at 180 kN/m². Master architectural structural drawings approved.

Excavation & RCC Column Footings

10 Feb 2026

UltraTech M25 grade concrete poured with Gallant Fe-550D rebar cage.

Plinth Beam & Damp Proof Course (DPC)

05 Mar 2026

DPC with Dr. Fixit waterproofing membrane to prevent capillary moisture.

Ground Floor Brickwork & Slab Casting

28 Mar 2026

21-day continuous pond curing completed. Strict cube strength verified.

First Floor RCC Slab & Electrical Conduits

20 Apr 2026

Currently in progress: concealed conduit laying and beam reinforcement staging.

Under Active Work & Quality Inspection
6

Internal Plaster & POP False Ceilings

Target: Jun 2026

Scheduled following conduit pressure testing.

7

Vitrified Tiles, Bath Fittings & Modular Kitchen

Target: Aug 2026

Kajaria 4x2 slabs and acrylic modular kitchen fitting.

8

Exterior Texture, Final Inspection & Handover

Target: Oct 2026

Deep cleaning, structural warranty issuance, and ceremonial keys handover.

Site Engineer Field Notes:

UltraTech M25 ready-mix concrete tested. 28-day cube strength is 31.4 N/mm² (exceeds IS 456 standards). Concealed electrical conduits laid with heavy duty PVC.

Project Leadership

Er. Amit Srivastava (Chief Civil Engineer)

Lead Civil & Structural In-Charge

Verified On-Site
Direct Management Escalation:
Sarvesh Chaurasia (MD) +91 9415144951

Quality Tests Log

Concrete Cube Strength Test

UltraTech M25 Mix: 31.4 N/mm² (Passed IS 456)

TMT Rebar Yield Strength

Gallant Fe-550D: >580 MPa High Ductility

Dr. Fixit Triple Waterproofing

Terrace, sunken slabs & foundation membrane

Century Marine Plywood (IS:710)

72-Hour boiling water & borer proof certified

Build Your Dream Villa

Get the same corporate-grade milestone tracking, live webcam inspection, and material assurance for your residential plot.

Calculate Construction Cost
Call WhatsApp Estimator Track