Sarvesh Chaurasia (Managing Representative)
Budheswar - Dubagga Ring Road, Lucknow
WhatsApp DirectCompare all 6 turnkey construction tiers side-by-side. Every feature, material specification, and luxury amenity clearly documented.
All packages include 100% material, skilled labor, engineering supervision, and foundation waterproofing.
| Scope & Specifications | Essential ₹1,500/sq.ft. |
Economical ₹1,600/sq.ft. |
Bronze ₹1,800/sq.ft. |
Silver ₹2,000/sq.ft. |
Gold (Recommended) ₹2,200/sq.ft. |
Platinum Luxury ₹2,600/sq.ft. |
|---|---|---|---|---|---|---|
| Architectural 2D Map & Layout | ||||||
| 3D Front Elevation View | (3D Walkthrough) | |||||
| UltraTech Cement Only | ||||||
| Gallant TMT Fe-550D Rebars | ||||||
| Modular Kitchen Setup | Basic Granite Slab | Granite Platform | Semi-Modular (No Chimney) | Full Modular + Chimney | Full Modular Acrylic + Chimney | Luxury Island / Hob + Chimney |
| Flooring Materials | Standard Vitrified (2x2) | Standard Vitrified (2x2) | Premium Vitrified (2x2) | Large Vitrified (4x2) | High-Gloss Vitrified Slabs | Italian Marble Look Slabs / Wooden |
| Dr. Fixit Waterproofing Protocol | (Extended) | |||||
| 1000L Water Tank & Water Pump | ||||||
| Concealed AC & Inverter Wiring | Standard Conduit | Standard Conduit | ||||
| Main Gate & Mosquito Mesh Doors | ||||||
| False Ceiling Execution | Living Room Only | All Bedrooms & Hall | All Rooms + Profile Cove | |||
| Wardrobes & Interior Furniture | Master Wardrobe | Wardrobes + Beds + LCD Unit | Fully Furnished Luxury | |||
| Smart Electricals & Appliances | Wiring Ready | 3 ACs, 2 TVs, Fridge, RO, Jhoomer | ||||
| Structural Safety Warranty | 5 Years | 5 Years | 5 Years | 5 Years | 5 Years | 5 Years + Extended AMC |
Common questions regarding rates, payments, and site work in Lucknow.
Yes, 100%! All our published rates (₹1,500 to ₹2,600 per sq.ft.) are turnkey rates including both certified materials (UltraTech Cement, Gallant TMT, bricks, sand, pipes, wires, tiles) and skilled civil labor, masonry, plumbing, electrical, and engineering supervision.
We follow transparent milestone-based billing linked to physical construction progress:
1. Booking & Map Approval: 5%
2. Foundation Excavation & Footing: 15%
3. Plinth Level & DPC: 15%
4. Column & Roof Slab Casting: 25%
5. Brickwork, Conduit & Plaster: 20%
6. Tile Flooring, Kitchen, Paint & Handover: 20%
Absolutely. If you want the Bronze Package but wish to add false ceiling in all bedrooms, or if you want Italian marble slabs instead of standard vitrified tiles, our engineers will calculate the exact price differential and update your transparent BOQ sheet.
A standard G+1 duplex home (approx. 2000-2400 sq.ft. built-up) typically takes 6 to 8 months from foundation excavation to final painting and handover, allowing mandatory concrete curing intervals.